Training Videos
Click on a category below to view and play training videos.
Sampling
- Hot Mix Asphalt-Truck Box Sampling
- Training: Stockpile Recovery to Minimize Segregation
- Sampling Stopped Conveyor Belt
- Sampling Running Conveyor Belt
- Sampling from Stockpile Alternative 1 – Part 1
- Sampling from Stockpile Alternative 1 – Part 2
- Sampling from Stockpile Alternative 2 – Part 1
- Sampling from Stockpile Alternative 2 – Part 2
- Sampling from Roadway
- Asphaltic Sampling: Truck Box with Clam Shell Device
- Asphaltic Sampling: Sampling from a Truckbox with Shovel
General
Sample Reduction
Sieve Analysis
- Drying
- Weighing
- R4-P4 Split
- Washing Coarse Aggregate
- Reducing P4 to 500 grams
- Washing Fine Aggregate
- Sieving Coarse Aggregate
- Sieving Fine Aggregate
Particle Shape
Proctor
- Proctor Reduce_0.75 Split
- Proctor Adding Water_4% Moisture
- Proctor Manual Hammer_4% Moisture
- Proctor Mechanical Hammer_8%
Plasticity Check
Compressive Strength
Flexural Strength
Super Air Meter
- SAM Test Operation
- Training: SAM Calibration
- Training: Checking the Clamp Arm Tension
- Training Long Press vs Short Press of the SAM Gauge
Cylinders and Beams
Sampling
- Hot Mix Asphalt-Truck Box Sampling
- Training: Stockpile Recovery to Minimize Segregation
- Sampling Stopped Conveyor Belt
- Sampling Running Conveyor Belt
- Sampling from Stockpile Alternative 1 – Part 1
- Sampling from Stockpile Alternative 1 – Part 2
- Sampling from Stockpile Alternative 2 – Part 1
- Sampling from Stockpile Alternative 2 – Part 2
- Sampling from Roadway
- Asphaltic Sampling: Truck Box with Clam Shell Device
- Asphaltic Sampling: Sampling from a Truckbox with Shovel