2011 COMPREHENSIVE CAMPUS MASTER PLAN UW-PLATTEVILLE REPORT AND ADDITIONAL INFORMATION
2011 Comprehensive Campus Master Plan Report UW-Platteville
2011 Comprehensive Campus Master Plan Supplemental Information Report UW-Platteville
Hydraulic Flow Modeling
Hydraulic Flow Modeling Maps and Data
Chilled Water
Existing Chilled Water Data
Existing Chilled Water Plan
Phase 1 Chilled Water Date
Phase 1 Chilled Water Plan
Phase 2 Chilled Water Date
Phase 2 Chilled Water Plan
Phase 3 Chilled Water Date
Phase 3 Chilled Water Plan
Steam
Existing Steam Data
Existing Steam Plan
Phase 1 Steam Data
Phase 1 Steam Plan
Phase 2 Steam Data
Phase 2 Steam Plan
Phase 3 Steam Data
Phase 3 Steam Plan
Load Flow Modeling Report
Appendix A - Text Report Base Low
Appendix B - Text Report Base High
Appendix C - Text Report Phase 1 High
Appendix D - Load Flow Phase 2 High
Appendix E - Load Flow Phase 3 High
Attachment 1 - Left Half One-Line
Attachment 2 - Right Half One-Line