Executive Council Minutes
March 23, 2006
Members Present: M. Anderson, J. Clifton, C. Cornett, M. Gill, P. Jinkins, A. Masoom,
M. Muslu, , L. Riedle, K. Rolle, R. Shultz, D. St.John, S. Wills
Visitors: T. Salmon-Stephens
Minutes from March 2, 2006
were not approved at this meeting.
Announcements:
1.
Mesut announced
that Electrical Engineering has three candidates coming in next week.
2.
Kurt said that
the search is going well for the Mechanical Engineering position and they
should have a list of interviewees by Friday.
3.
Abulkhair said
that the alumni reception went well last night.
They had 40 students.
4.
Mohan mentioned
that they will be having Software Engineering candidates in next week and April
7th.
5.
Kurt said that
he and Clyde will be going to the Regional FIRST Contests in
6.
Lisa announced
that Jennifer Jensen accepted the Program Manager position at
7.
Tammy mentioned
that EXPO is Thursday, March 30th.
8.
Tammy also
mentioned about the Women in Engineering Career Day on April 24th.
9.
Tammy said that
the
10.
Lisa said that
Nikki Drone is the new administrative assistant in the Highway Technician
Certification Program and Mary Fischer was hired as an LTE to assist Lisa with
ABET.
11.
Lisa mentioned
that ABET is moving along and reminded everyone that the deadline is May 1st
for final copies. Rich said that he has
to mail the final document in June.
Agenda
1.
PURF Grants –
Lisa Riedle
Lisa
said that the PURF Grants announcements came out Tuesday. This is a great opportunity and there could be
up to 11 this year. If anyone needs
assistance especially with the preparation, please contact Lisa and she will
give some pointers.
2.
Advisory Board
Breakout Sessions – Rich Shultz
Rich
said that the Breakout Sessions will be for each Department to utilize the
assistance of the Board Members for input on ABET information. Each Department Chair and Program Coordinator
will be responsible for bringing issues to the sessions. So please come prepared
with questions, etc. (i.e., where is the program headed in 2-3 years?). At 3:00 p.m. everyone will meet together for
discussion updates.
3.
Budget – Rich
Shultz
The
cutoff dates for purchasing have been listed.
Please watch those dates and your monies. Rich will be reviewing the DIN monies. Chemistry and Mathematics should let Rich know
if they have any additional needs. There
are some TSI funds available.
4.
Interviews
On-Campus – Lisa Riedle
Lisa
mentioned that all companies coming on-campus for interviews need to be
registered with the
5.
Ottensman
Renovation – Rich Shultz
Rich
said ground breaking will take place one year from now for the new building and
January 2009 is the scheduled completion date.
As soon as the new building is done, renovation will begin on Ottensman
Hall. The cost for gutting and
rebuilding Ottensman would be approximately 30 million dollars. This project is the UW-System’s list with
about 15 other 30 million dollar projects.
Rich is wondering if Ottensman
Hall could be rebuilt without complete gutting to get the costs down. Ullrich Hall was a 7 million dollar project,
but the square footage is smaller than Ottensman Hall. Can we minimize knocking out walls to cut the
costs? Can we move around existing space
and clean-up the rooms? There was much discussion
on ideas and Lisa shared the tentative floor plan on the new building. A consensus for Ottensman Hall was to have a
new test machine, better ventilation in the Highway Technician Certification
Program area, plumbing, sinks, and hoods for labs on the second floor. Rich asked everyone to think about what each
program would like to do, what their needs are, and what else do we need? There is no rush right now for this
information.
The meeting adjourned at
10:55 a.m.